The Challenge
The scope and scale demanded disciplined coordination across a complex family compound, with every timber assembly needing to align precisely with the architecture, framing, steel, and construction schedule.
The Project Required:
- Resolving details with the architect and design team
- Making structural and applied timbers fit the framing
- Coordinating steel connections with timber assemblies
- Maintaining fabrication accuracy across a large package
- Securing and processing material under schedule pressure


